AGP Picks
View all

MaineDOT to Work on I-295 in South Portland

 MaineDOT to Work on I-295 in South Portland

Drivers should plan for detours.

SOUTH PORTLAND – July 30, 2026 — From August 9 to August 11, the Maine Department of Transportation (MaineDOT) will close Route 1 between Billy Vachon Avenue and the I‑295 southbound on‑ramp at Exit 4, including the ramp from Veterans Memorial Bridge, from 8 P.M. to 6 A.M. each night as part of a highway construction project. Traffic will be detoured via Main Street, Westbrook Street, and Broadway to the I‑295 southbound on‑ramp at Exit 3.

Drivers and pedestrians should follow the detour map and detour signs while on site. 

Message boards are in place to warn drivers of the closure.

Motorists should expect delays and use caution when traveling through the detour zone.

The project work is weather dependent and will be rescheduled to the following night if the weather does not allow for work to be conducted.

Work is expected to be completed by Fall 2026.

The contractor for this project is Wyman & Simpson of Richmond, Maine.         

The contract amount is $12,444,444.44.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Industry Journal of Maine

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.